Estimating in Building Construction

by ;
Format: Hardcover
Pub. Date: 1998-08-01
Publisher(s): Pearson College Div
List Price: $98.00

Buy New

Usually Ships in 2-3 Business Days
$97.51

Rent Textbook

Select for Price
There was a problem. Please try again later.

Used Textbook

We're Sorry
Sold Out

eTextbook

We're Sorry
Not Available

This item is being sold by an Individual Seller and will not ship from the Online Bookstore's warehouse. The Seller must confirm the order within two business days. If the Seller refuses to sell or fails to confirm within this time frame, then the order is cancelled.

Please be sure to read the Description offered by the Seller.

Summary

An update of the proven estimating text by Frank Dagostino, "Estimating in Building Construction, 7/e," provides everything you need for a course in Estimating. It combines sound coverage of principles with step-by-step procedures to help students learn concepts more easily. Ideal for construction, architecture, and engineering students, it reflects the popular approach of tracing a complete project's progress. Added in this edition is a discussion of computers in estimating, different types of estimates (e.g., square foot, project comparison, and assembly estimating), how to determine labor productivity, and how to determine labor burden.

Table of Contents

1 Introduction to Estimating
1(12)
1-1 General Introduction
1(1)
1-2 Types of Estimates
2(1)
Detailed Estimate
2(1)
Preliminary Estimates (Volume and Area)
2(1)
Conceptual Estimates
3(1)
1-3 Estimating Opportunities
3(3)
1-4 The Estimator
6(1)
1-5 Quantity Surveying
7(1)
1-6 Types of Bids
8(1)
1-7 Contract Documents
8(1)
1-8 Bidding Information
9(1)
1-9 Availability of Contract Documents
9(2)
1-10 Sources of Estimating Information
11(1)
Review Questions
11(2)
2 Contracts, Bonds, and Insurance
13(10)
2-1 The Contract System
13(1)
2-2 Types of Agreements
14(3)
Lump-Sum Agreement (Stipulated Sum, Fixed Price)
14(1)
Unit-Price Agreement
15(1)
Cost-Plus-Fee Agreements
16(1)
2-3 Agreement Provisions
17(1)
2-4 Bonds
18(2)
Bid Bond
19(1)
Performance Bond
19(1)
Labor and Material Bond
20(1)
2-5 Obtaining Bonds
20(1)
2-6 Insurance
21(1)
Review Questions
22(1)
3 Specifications
23(12)
3-1 Specifications
23(1)
3-2 Construction Specifications Institute
24(1)
3-3 Invitation to Bid (Advertisement for Bids)
24(2)
3-4 Instruction to Bidders (Information for Bidders)
26(1)
3-5 Bid (Proposal) Forms
27(3)
3-6 Form of Owner-Contractor Agreement
30(1)
3-7 General Conditions
30(1)
3-8 Supplementary General Conditions
30(1)
3-9 Technical Trade Sections
31(1)
3-10 Alternates
31(1)
3-11 Addenda
32(1)
3-12 Errors in the Specifications
33(1)
Review Questions
34(1)
4 The Estimate
35(14)
4-1 Organization
35(1)
4-2 Planning the Estimate
36(1)
4-3 Notebook
37(1)
4-4 To Bid or Not to Bid
38(1)
4-5 The Estimate
38(2)
4-6 Site Investigation
40(1)
4-7 Subcontractors
40(2)
4-8 Materials
42(1)
4-9 Workup Sheets
43(2)
4-10 Summary Sheet
45(1)
4-11 Errors and Omissions
45(2)
Review Questions
47(2)
5 Computer-Assisted Estimating
49(10)
5-1 Use of Computers in Estimating
49(1)
5-2 Computer Estimating
50(1)
5-3 Typical Computer Reports (Timberline's Precision Edition)
50(7)
Review Questions
57(2)
6 Overhead and Contingencies
59(14)
6-1 Overhead
59(1)
6-2 Home Office Overhead
60(1)
6-3 Job Overhead
61(3)
6-4 Scheduling
64(2)
6-5 Contingencies
66(2)
6-6 Checklist
68(4)
Review Questions
72(1)
7 Labor
73(6)
7-1 General
73(2)
7-2 Unions-Wages and Rules
75(1)
7-3 Open Shop
75(1)
7-4 Pricing Labor
76(1)
7-5 Labor Diagrams
76(1)
Review Questions
77(2)
8 Equipment
79(8)
8-1 General
79(1)
8-2 Operating Costs
80(1)
8-3 Depreciation
81(1)
8-4 Interest
82(1)
8-5 Ownership Costs
82(1)
8-6 Rental Costs
83(1)
8-7 Miscellaneous Tools
84(1)
8-8 Cost Accounting
84(1)
8-9 Mobilization
85(1)
8-10 Checklist
85(1)
Review Questions
85(2)
9 Excavation
87(38)
9-1 General
87(1)
9-2 Specifications
87(1)
9-3 Soil
88(1)
9-4 Calculating Excavation
88(1)
9-5 Equipment
89(1)
9-6 Earthwork-New Site Grades and Rough Grading
90(14)
Cross-Section Method
92(9)
Average End Area
101(3)
9-7 Perimeter and Area
104(1)
9-8 Topsoil Removal
105(2)
9-9 General Excavation
107(6)
9-10 Special Excavation
113(1)
9-11 Backfilling
113(3)
9-12 Excess and Borrow
116(1)
9-13 Spreading Topsoil, Finish Grade
117(1)
9-14 Landscaping
117(1)
9-15 Pumping (Dewatering)
117(1)
9-16 Rock Excavation
118(1)
9-17 Subcontractors
118(1)
9-18 Excavation Checklist
119(1)
9-19 Piles
119(1)
9-20 Pile Checklist
120(1)
9-21 Asphalt Paving
121(2)
Review Questions
123(2)
10 Concrete
125(42)
10-1 Concrete Work
125(1)
10-2 Estimating Concrete
126(12)
10-3 Reinforcing
138(10)
10-4 Vapor Retarder
148(1)
10-5 Accessories
149(1)
10-6 Concrete Finishing
150(2)
10-7 Curing
152(2)
10-8 Transporting Concrete
154(1)
10-9 Forms
155(3)
10-10 Form Liners
158(1)
10-11 Checklist
159(1)
10-12 Precast Concrete
160(1)
10-13 Specifications
161(1)
10-14 Estimating
161(1)
10-15 Precast Tees
161(1)
10-16 Precast Slabs
162(1)
10-17 Precast Beams and Columns
163(1)
10-18 Miscellaneous Precast
163(1)
10-19 Precast Costs
164(1)
10-20 Precast Checklist
165(1)
Review Questions
165(2)
11 Masonry
167(26)
11-1 General
167(1)
11-2 Specifications
167(1)
11-3 Labor
168(1)
11-4 Bonds (Patterns)
168(3)
11-5 Concrete Masonry
171(1)
Concrete Block
171(1)
11-6 Specifications-Concrete Masonry
171(1)
11-7 Estimating-Concrete Masonry
171(3)
11-8 Clay Masonry
174(3)
11-9 Specifications-Brick
177(1)
11-10 Estimating Brick
178(1)
11-11 Specifications-Tile
179(1)
11-12 Estimating Tile
180(1)
11-13 Stone Masonry
180(1)
11-14 Specifications-Stone
180(1)
11-15 Estimating Stone
180(1)
11-16 Mortar
181(1)
11-17 Accessories
182(6)
11-18 Reinforcing Bars
188(1)
11-19 Cleaning
188(1)
11-20 Equipment
189(1)
11-21 Cold Weather
189(1)
11-22 Subcontractors
190(1)
11-23 Checklist
191(1)
Review Questions
192(1)
12 Metals
193(12)
12-1 General
193(1)
12-2 Structural Metal
193(1)
12-3 Structural Metal Framing
194(2)
12-4 Metal Joists
196(5)
12-5 Metal Decking
201(2)
12-6 Miscellaneous Structural Metal
203(1)
12-7 Metal Erection Subcontractors
203(1)
12-8 Miscellaneous Metals
203(1)
12-9 Metal Checklist
204(1)
Review Questions
204(1)
13 Wood
205(42)
13-1 Frame Construction
205(1)
13-2 Board Measure
206(1)
13-3 Floor Framing
207(12)
13-4 Wall Framing
219(12)
Exterior Walls
219(10)
Interior Walls
229(2)
13-5 Ceiling Assembly
231(1)
13-6 Roof Assembly
232(5)
13-7 Trim
237(1)
13-8 Labor
238(1)
13-9 Wood Systems
239(1)
13-10 Wood Trusses
239(3)
13-11 Laminated Beams and Arches
242(1)
13-12 Wood Decking
243(1)
13-13 Plywood Systems
243(1)
13-14 Wood Checklist
244(1)
Review Questions
244(3)
14 Thermal and Moisture Protection
247(18)
14-1 Waterproofing
247(1)
14-2 Membrane Waterproofing
247(3)
14-3 Integral Method
250(1)
14-4 Metallic Method
250(1)
14-5 Dampproofing
250(1)
14-6 Painting Method
250(2)
14-7 Parging (Plastering)
252(1)
14-8 Insulation
253(2)
14-9 Roofing
255(1)
14-10 Roof Areas
255(1)
14-11 Shingles
256(1)
Asphalt Shingles
256(1)
Wood Shingles
257(1)
14-12 Built-Up Roofing
257(2)
14-13 Corrugated Sheets (Including Ribbed, V-Beam)
259(1)
14-14 Metal Roofing
259(1)
14-15 Slate
260(1)
14-16 Tile
260(1)
14-17 Sheets, Tile, and Shingles Formula
260(1)
14-18 Liquid Roofing
261(1)
14-19 Flashing
261(1)
14-20 Insulation
261(1)
14-21 Roofing Trim
262(1)
14-22 Labor
262(1)
14-23 Equipment
262(1)
14-24 Checklist
262(1)
Review Questions
263(2)
15 Doors and Windows
265(16)
15-1 Window and Curtain Wall Frames
265(4)
15-2 Accessories
269(2)
15-3 Doors
271(3)
15-4 Prefitting and Machining (Premachining) Doors
274(1)
15-5 Prefinishing Doors
275(2)
15-6 Door Frames
277(1)
15-7 Hardware
277(1)
15-8 Accessories
277(1)
15-9 Checklist for Doors and Frames
278(1)
15-10 Glass
278(1)
Review Questions
279(2)
16 Finishes
281(28)
16-1 Drywall and Wetwall Construction
281(1)
16-2 Supporting Construction
282(4)
16-3 Suspended Ceiling Systems
286(1)
16-4 Types of Assemblies
286(1)
16-5 Wallboard Types
287(1)
16-6 Drywall
288(1)
16-7 Column Fireproofing
289(1)
16-8 Accessories
289(4)
16-9 Wetwall Construction
293(1)
16-10 Plaster
293(3)
16-11 Lath
296(2)
16-12 Accessories
298(1)
16-13 Drywall and Wetwall Checklist
298(1)
16-14 Flooring
299(6)
Wood Flooring
299(1)
Resilient Flooring
300(2)
Carpeting
302(2)
Tile
304(1)
16-15 Painting
305(1)
16-16 Floors and Painting Checklist
306(1)
Review Questions
307(2)
17 Electrical
309(6)
17-1 Electrical Work
309(1)
17-2 Single Contracts
310(1)
17-3 Separate Contracts
311(1)
17-4 Coordination Requirements
311(2)
17-5 Checklist
313(1)
Review Questions
313(2)
18 Plumbing
315(4)
18-1 Plumbing Work
315(2)
18-2 Single Contracts
317(1)
18-3 Separate Contracts
317(1)
18-4 Coordination Requirements
318(1)
18-5 Checklist
318(1)
Review Questions
318(1)
19 Heating, Ventilating, and Air-Conditioning
319(4)
19-1 HVAC Work (Heating, Ventilating, and Air-Conditioning)
319(1)
19-2 Single Contracts
320(1)
19-3 Separate Contracts
321(1)
19-4 Coordination Requirements
321(1)
19-5 Checklist
321(1)
Review Questions
322(1)
20 Profit
323(2)
20-1 Profit
321(4)
Appendix A Drawings and Outline Specifications of a Small Commercial Building 325(2)
Appendix B Drawings and Outline Specifications of a Residence 327(2)
Appendix C Drawings and Outline Specifications of a Small Commercial Building 329(3)
Appendix D Common Terms Used in the Building Industry 332(6)
Appendix E Conversions 338(3)
Appendix F Spreadsheets on the CD 341(8)
Index 349

An electronic version of this book is available through VitalSource.

This book is viewable on PC, Mac, iPhone, iPad, iPod Touch, and most smartphones.

By purchasing, you will be able to view this book online, as well as download it, for the chosen number of days.

A downloadable version of this book is available through the eCampus Reader or compatible Adobe readers.

Applications are available on iOS, Android, PC, Mac, and Windows Mobile platforms.

Please view the compatibility matrix prior to purchase.